Best Electricians in Huntingdonshire
Menu Close

Greater London House

Installed the Fire Alarm, and Central Battery system for the entire building.

RSA Building Peterborough

Full EICR Inspection Test and Report for Diligenta Offices.

KFC

Full EICR, Fire Alarm, Emergency Lighting, and PAT Testing on various sites throughout the UK.

Somerset House

Installed the Data Networks for the Queen’s Architects inclusive of full testing and commissioning of the system.

Tower Bridge

Installed the electrical systems to the Museum and Toilet blocks Plus the Testing.

Burger King

Full EICR, Fire Alarm, Emergency Lighting, and PAT Testing on various sites throughout the UK.

Charter Place Uxbridge

Full EICR for the entire property including:- Coca Cola, Nexan Oil and all other Tenants.

Wembley Stadium

Full EICR of the entire building from the incoming position and the entire building.

101 Finsbury Pavement London

Full Black Building EICR Test of the Entire Building.

Electrical Engineering Building Imperial College

Full EICR Inspection and Report.

HSBC Bank

Full EICR Inspection and Report for 200 hundred Branches around the country.

IKEA

Full EICR Inspection and Report for Brent Cross and Southampton.

Inglewood Manor

PAT Testing of the entire site.

IPSL

Full EICR Inspection and Report for 3 of their Sites in the UK.

AAH

Full EICR Inspection Test & Report in Swansea.

66 Prescott Street

Full EICR Inspection Test & Report for the Building.

85a Hampstead High Street

Full EICR Inspection Test & Report Plus Replacement of multiple fuseboards into 1 consolidated unit.

Radisson Blue Heathrow

Full EICR Inspection Test & Report for the Building.

Redditch Magistrates Court

Full EICR Inspection Test & Report.

Santander Bank

Full EICR Inspection Test & Report.

St Marys Medical School

Full EICR Inspection Test & Report of the entire site.

The 3 Network data Centre Manchester

Full EICR Inspection Test & Report, and Thermal Imaging for the entire site.

The Royal Brompton Hospital

Full EICR Inspection Test & Report, for the Entire Site.

The Tower of London

Installation of Boiler Controls in Pyro in a grade 1 Listed Building.

White Chapel Art Gallery

Full EICR Inspection Test & Report, for the Entire site.

Worlds End Estate London

Installed full Cyclo Controls for all 748 Flats, Plus a full EICR test.

Wragge Lawrence Graham & Co

Full EICR Inspection Test & Report.

Costa Coffee

Full EICR, Fire Alarm, Emergency Lighting, and PAT Testing on various sites throughout the UK.

BAPS Shri Swaminarayan Mandir London

Full Electrical Installation plus EICR Inspection Test & Report, for the Mandir.

Mulberry Business Park

Full EICR Inspection Test & Report.